Sunrise Wind 2
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
An expansion of Sunrise Wind 1. Multiple configuration options were submitted. Port of interconnection will be a local substation in either New York City or Long Island, as determined by New York State. Further details, including final number of determined megawatts, exact location, and estimated construction cost for the determined configuration to be announced later.
- Status
- Failure
- Sector
- Wind, Power Generation (CCGT), Seaport, Commercial
- Location
- Montauk, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sunrise Wind 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Abandoned |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | An expansion of Sunrise Wind 1. Multiple configuration options were submitted. Port of interconnection will be a local substation in either New York City or Long Island, as determined by New York State. Further details, including final number of determined megawatts, exact location, and estimated construction cost for the determined configuration to be announced later. |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Montauk |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Wind, Power Generation (CCGT), Seaport, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Wind projects in United States of America
- 110 North Wacker
- Ruby Run Tentative Subdivision Map, Special Development Permit, Affordable Housing Plan and Abandonment
- Meadows Field Airport Taxiway G Rehabilitation and
- Abandonment Of Excess Right-Of-Way Fronting 7721 Winding Way
- Lynn's School of English ZV Letter
- 4212 Winding Way
- Oglala Sioux Tribe Broadband Project
- Construction of 525 rental housing units in 4 blocks in the Medina de Cuatro Vientos, Madrid (Spain)
