Sunset Meadows Lift Station Rehabilitation
Pre-design · Texas · Last reported Sep 2025
Source: Dodge
Rehabilitate lift station with the removal and installation of a new 6' wet well with corrosion resistant lining, replace two pumps with submersibles including guiderails and new wet well top, replace valves and discharge piping, flow meter, provide new city standard electrical control panel along with new electrical rack, SCADA, and provide a new City standard manual transfer switch for mobile ge
- Status
- Prospective
- Sector
- Water Supply and Storage, Power Generation (CCGT), Cement, Government, Waste Processing and Treatment, Commercial, Manufacturing (Industrial)
- Location
- Pearland, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Sunset Meadows Lift Station Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Rehabilitate lift station with the removal and installation of a new 6' wet well with corrosion resistant lining, replace two pumps with submersibles including guiderails and new wet well top, replace valves and discharge piping, flow meter, provide new city standard electrical control panel along with new electrical rack, SCADA, and provide a new City standard manual transfer switch for mobile generator connection. Additional items include replacement of the concrete work slab surrounding th... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Pearland |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Cement, Government, Waste Processing and Treatment, Commercial, Manufacturing (Industrial) |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
