SunSHIFT Pre-Commercial Deployment
Sector: Commercial • Location: Australia
Source: Australian Renewable Energy Agency (ARENA)
The project involves the fabrication of a 1 MW redeployable solar system (‘SunSHIFT’) that will be designed, constructed, ground-transported, and assembled at the South32 Cannington mine site in central Queensland.The solar system can be removed and re-deployed elsewhere if it is no longer needed, or if the mine site is decommissioned. The project aims to prove that a modular and redeployable sola
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project involves the fabrication of a 1 MW redeployable solar system (‘SunSHIFT’) that will be designed, constructed, ground-transported, and assembled at the South32 Cannington mine site in central Queensland.The solar system can be removed and re-deployed elsewhere if it is no longer needed, or if the mine site is decommissioned. The project aims to prove that a modular and redeployable solar system can be deployed at scale, packed-up and redeployed, providing a cleaner and more cost effective alternative to diesel generators for off-grid users such as mines, construction sites and remote communities.How the project worksRemote communities, mines and construction sites have traditionally depended on diesel and natural gas, which can be expensive.Small-scale renewable generation presents new opportunities to improve energy supply, reduce the need for network augmentation and reduce electricity costs. However, there have previously been few options available to deploy renewable energy systems for short-term arrangements (five to ten years).The redeployable asset helps mitigate the owner’s risk of an asset outliving the life of a mine and means decisions about long-term investments are easier to make. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
