logo

SunSHIFT Pre-Commercial Deployment

Sector: Commercial • Location: Australia

Source: Australian Renewable Energy Agency (ARENA)

Project
Closed

The project involves the fabrication of a 1 MW redeployable solar system (‘SunSHIFT’) that will be designed, constructed, ground-transported, and assembled at the South32 Cannington mine site in central Queensland.The solar system can be removed and re-deployed elsewhere if it is no longer needed, or if the mine site is decommissioned. The project aims to prove that a modular and redeployable sola

Project Information FAQ

Project Information

5 Q
The project “SunSHIFT Pre-Commercial Deployment” is an infrastructure initiative in the Commercial sector, located in Australia. Taiyo aggregates data on it from Australian Renewable Energy Agency (ARENA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves the fabrication of a 1 MW redeployable solar system (‘SunSHIFT’) that will be designed, constructed, ground-transported, and assembled at the South32 Cannington mine site in central Queensland.The solar system can be removed and re-deployed elsewhere if it is no longer needed, or if the mine site is decommissioned. The project aims to prove that a modular and redeployable solar system can be deployed at scale, packed-up and redeployed, providing a cleaner and more cost effective alternative to diesel generators for off-grid users such as mines, construction sites and remote communities.How the project worksRemote communities, mines and construction sites have traditionally depended on diesel and natural gas, which can be expensive.Small-scale renewable generation presents new opportunities to improve energy supply, reduce the need for network augmentation and reduce electricity costs. However, there have previously been few options available to deploy renewable energy systems for short-term arrangements (five to ten years).The redeployable asset helps mitigate the owner’s risk of an asset outliving the life of a mine and means decisions about long-term investments are easier to make.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data