logo

Sunshine State Solar Farm and BESS project

Sector: Solar • Location: Rollingstone, Queensland, Australia

Source: Renewables Now

Project
Planned

Swedish renewables developer OX2 has laid out a plan for an up to 150-MWdc solar park with an integrated battery energy storage system (BESS) in Queensland, Australia. The project will be located in Rollingstone, about 50 kilometres north of Townsville, connecting to the grid via a switching station linked to an existing 132-kV transmission line. The photovoltaic farm and its co-located two-hour b

Status
Prospective
Sector
Solar, Energy Storage, Raw Materials, Power Generation (CCGT)
Location
Rollingstone, Queensland, Australia
Updated
22 Jul 2026
Source
Renewables Now

ConstructChat

Ask ConstructChat about Sunshine State Solar Farm and BESS project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Sunshine State Solar Farm and BESS project” is an infrastructure initiative in the Solar sector, located in Rollingstone, Queensland, Australia. Taiyo aggregates data on it from Renewables Now.

Participants

Company

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Swedish renewables developer OX2 has laid out a plan for an up to 150-MWdc solar park with an integrated battery energy storage system (BESS) in Queensland, Australia. The project will be located in Rollingstone, about 50 kilometres north of Townsville, connecting to the grid via a switching station linked to an existing 132-kV transmission line. The photovoltaic farm and its co-located two-hour battery of 128 MW/256 MWh will be installed across 186 hectares of private land. Once operational, it will generate electricity for around 55,000 homes and mitigate around 200,000 tonnes of CO2 emissions annually. The project supports Queensland’s goal of 70% renewable energy by 2032 and net zero emissions by 2050. Construction is planned to take around 18 months with commissioning by 2029.

Original sector

Renewable Energy

Location

Country

Australia

State

Queensland

City

Rollingstone

Source

Source

Renewables Now

URL

More Details

Record type

Project

Sector

Solar, Energy Storage, Raw Materials, Power Generation (CCGT)

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project