Sunstone Solar (FKA Echo Solar) Ph 3 200MW/200MW BESS
Sector: Power Generation (CCGT) • Location: Lexington, Oregon, United States of America
Source: Dodge
The proposed Facility will be a photovoltaic solar energy generation facility with up to 1,200 megawatts (MW) alternating current (AC) of nominal and average generating capacity as defined in Oregon Revised Statute (ORS) 469.300(4)(c). The Facility will generate electricity using solar panels wired in series and in parallel to form arrays, which in turn are connected to electrical infrastructure.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Solar, Commercial, Energy Storage
- Location
- Lexington, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Sunstone Solar (FKA Echo Solar) Ph 3 200MW/200MW BESS
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed Facility will be a photovoltaic solar energy generation facility with up to 1,200 megawatts (MW) alternating current (AC) of nominal and average generating capacity as defined in Oregon Revised Statute (ORS) 469.300(4)(c). The Facility will generate electricity using solar panels wired in series and in parallel to form arrays, which in turn are connected to electrical infrastructure. Additionally, the Facility may also include a distributed battery energy storage system capable o... |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Lexington |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Solar, Commercial, Energy Storage |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
