logo
ProjectUnder Construction

Sunstone Solar Project

One of 10,000+ projects Taiyo tracks in Oregon.

Source: The Asheville Citizen Times

Sunstone Solar is a solar and energy storage project developed by Pine Gate Renewables, located in Morrow County, Oregon. It is the largest of its kind in the U.S., with 1200 MW of solar power and 1200 MW of energy storage under construction.

Status
Under Construction
Sector
Energy Storage, Solar, Power Generation (CCGT)
Location
Oregon, United States of America
Updated
22 Jul 2026
Source
The Asheville Citizen Times

ConstructChat

Ask ConstructChat about Sunstone Solar Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Sunstone Solar Project” is an infrastructure initiative in the Energy Storage sector, located in Oregon, United States. Taiyo aggregates data on it from The Asheville Citizen Times.

Participants

Company

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Sunstone Solar is a solar and energy storage project developed by Pine Gate Renewables, located in Morrow County, Oregon. It is the largest of its kind in the U.S., with 1200 MW of solar power and 1200 MW of energy storage under construction.

Original sector

Energy

Location

Country

United States of America (USA)

State

Oregon

Source

Source

The Asheville Citizen Times

URL

More Details

Record type

Project

Sector

Energy Storage, Solar, Power Generation (CCGT)

Article published date

2025-11-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project