logo

SunZia Project

Sector: Power Generation (CCGT) • Location: New Mexico, United States

Source: The Detroit News

Project
Under Construction

The SunZia project is designed to transport more than three gigawatts of clean power from New Mexico to Arizona, facilitating the flow of renewable energy to the West Coast.

Status
Under Construction
Sector
Power Generation (CCGT), Power Transmission
Location
New Mexico, United States of America
Updated
22 Jul 2026
Source
The Detroit News

ConstructChat

Ask ConstructChat about SunZia Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SunZia Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in New Mexico, United States. Taiyo aggregates data on it from The Detroit News.

Participants

Not available for this record.

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The SunZia project is designed to transport more than three gigawatts of clean power from New Mexico to Arizona, facilitating the flow of renewable energy to the West Coast.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

New Mexico

Source

Source

The Detroit News

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Power Transmission

Article published date

2025-03-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project