SunZia Transmission Project
Sector: Wind • Location: New Mexico, USA
Source: Renewables Now
Construction of the SunZia transmission project in New Mexico has been launched after developer Pattern Energy Group LP received a notice to proceed from the Department of Interior (DOI). This project includes a 550-mile high-voltage direct current line capable of transmitting 3,000 MW of clean power across Western states, sourced from a 3,500-MW wind turbine complex in New Mexico.
- Status
- Under Construction
- Sector
- Wind, Power Generation (CCGT), Power Transmission
- Location
- New Mexico, United States of America
- Updated
- 22 Jul 2026
- Source
- Renewables Now
ConstructChat
Ask ConstructChat about SunZia Transmission Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of the SunZia transmission project in New Mexico has been launched after developer Pattern Energy Group LP received a notice to proceed from the Department of Interior (DOI). This project includes a 550-mile high-voltage direct current line capable of transmitting 3,000 MW of clean power across Western states, sourced from a 3,500-MW wind turbine complex in New Mexico. |
Original sector | Onshore Wind |
Budget |
Location
Country | United States of America (USA) |
State | New Mexico |
Source
Source | Renewables Now |
URL |
More Details
Record type | Project |
Sector | Wind, Power Generation (CCGT), Power Transmission |
Article published date | 2025-03-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
