Suoi Lum 1 Hydropower Plant
Sector: Water Supply and Storage • Location: Vietnam
Source: World Bank Group
Nam Lum Hydroelectric JSC, a private entity from Vietnam, was planning the development of the 20MW Suoi Lum 1 Hydropower Plant, Bac Yen district, Son La province. Annual production was estimated at 74,540 MWh, to be be supplied to the national grid via a 110kV transmission line to the Muong La subtransformer (9km).
Commissioning was expected for March 2012. Lifespan was 30 years. Construction l
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Nam Lum Hydroelectric JSC, a private entity from Vietnam, was planning the development of the 20MW Suoi Lum 1 Hydropower Plant, Bac Yen district, Son La province. Annual production was estimated at 74,540 MWh, to be be supplied to the national grid via a 110kV transmission line to the Muong La subtransformer (9km). Commissioning was expected for March 2012. Lifespan was 30 years. Construction lasted 3 years. Electricity tariff was VNW 830.3 per kWh ($0.0399 per kWh). The PPA with EVN was signed in December 2009. The EIA was approved in February 2008. The Feasibility study was approved in November 2009. The EPC contract for the waterway was signed in April 2010. The equipment supply contract was signed in July 2010. Financial closure was reached in December 2009. Total investment cost was VND 472.307 billion ($22.7 million). WACC was 13.17%. Debt to equity ratio was 73/27. The banks involved were Agribank (20% of project cost for 5.8%) and Vietnam Development Bank (53% of project cost, for 9.7%). The project also received a four year tax break (0%), and 5% for the following 9 years. After that business income tax was to be 28%. The project also applied for UNFCCC/CDM financing. http://cdm.unfccc.int/filestorage/K/J/G/KJG1HI6NBU73REXV9DYQ25LWPTMFA8/PDD_Suoi%20Lum%201.pdf?t=ekh8bTI3dXd4fDBko6n5ziSrcieonerc9Imf |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |