Nam Lum Hydroelectric JSC, a private entity from Vietnam, was planning the development of the 20MW Suoi Lum 1 Hydropower Plant, Bac Yen district, Son La province. Annual production was estimated at 74,540 MWh, to be be supplied to the national grid via a 110kV transmission line to the Muong La subtransformer (9km).
Commissioning was expected for March 2012. Lifespan was 30 years. Construction l
- Status
- Prospective
- Sector
- Hydro, Water Supply and Storage, Power Generation (CCGT), Commercial, Government
- Location
- Son La, Vietnam
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Suoi Lum 1 Hydropower Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Nam Lum Hydroelectric JSC, a private entity from Vietnam, was planning the development of the 20MW Suoi Lum 1 Hydropower Plant, Bac Yen district, Son La province. Annual production was estimated at 74,540 MWh, to be be supplied to the national grid via a 110kV transmission line to the Muong La subtransformer (9km). Commissioning was expected for March 2012. Lifespan was 30 years. Construction lasted 3 years. Electricity tariff was VNW 830.3 per kWh ($0.0399 per kWh). The PPA with EVN was signed in December 2009. The EIA was approved in February 2008. The Feasibility study was approved in November 2009. The EPC contract for the waterway was signed in April 2010. The equipment supply contract was signed in July 2010. Financial closure was reached in December 2009. Total investment cost was VND 472.307 billion ($22.7 million). WACC was 13.17%. Debt to equity ratio was 73/27. The banks involved were Agribank (20% of project cost for 5.8%) and Vietnam Development Bank (53% of project cost, for 9.7%). The project also received a four year tax break (0%), and 5% for the following 9 years. After that business income tax was to be 28%. The project also applied for UNFCCC/CDM financing. http://cdm.unfccc.int/filestorage/K/J/G/KJG1HI6NBU73REXV9DYQ25LWPTMFA8/PDD_Suoi%20Lum%201.pdf?t=ekh8bTI3dXd4fDBko6n5ziSrcieonerc9Imf |
Original sector | Energy |
Budget |
Location
Country | Vietnam |
State | Son La |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Hydro, Water Supply and Storage, Power Generation (CCGT), Commercial, Government |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project