logo
ProjectOngoing

Superconducting cables for sustainable energy transition

Sector: Fertilizers • Location: Norway, Germany, Portugal, Slovakia, Italy, France, Ireland

Source: EU Funding & Tenders Portal

Superconducting medium-voltage cables, based on HTS and MgB2 materials, have the potential to become the preferred solution for energy transmission from many renewable energy sites to the electricity grid. Onshore HTS cables provide a compact design, which preserves the environment in protected areas and minimizes land use in urban areas where space is limited. Offshore HTS cables compete on cost

Status
Under Construction
Sector
Fertilizers, Hydrogen, Power Generation (CCGT), Seaport
Location
Norway
Updated
22 Jul 2026
Source
EU Funding & Tenders Portal

ConstructChat

Ask ConstructChat about Superconducting cables for sustainable energy transition

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Superconducting cables for sustainable energy transition” is an infrastructure initiative in the Fertilizers sector, located in Norway, Germany, Portugal, Slovakia, Italy, France, Ireland. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Participants

Not available for this record.

Status

Original status

ongoing

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Superconducting medium-voltage cables, based on HTS and MgB2 materials, have the potential to become the preferred solution for energy transmission from many renewable energy sites to the electricity grid. Onshore HTS cables provide a compact design, which preserves the environment in protected areas and minimizes land use in urban areas where space is limited. Offshore HTS cables compete on cost and – compared to conventional HVDC cables – have the clear benefit of eliminating the need for large and costly converter stations on the offshore platforms. MgB2 cables in combination with safe liquid hydrogen transport directly from renewable energy generation sites to e.g., ports and heavy industries, introduce a new paradigm of two energy vectors used simultaneously in the future. Both HTS, cooled with liquid nitrogen, and MgB2, cooled with liquid hydrogen, MVDC superconducting cables will be designed, manufactured, and tested, including a six-month test for the MgB2 cable. For grid protection, a high-current superconducting fault current limiter module will be designed and tested. Furthermore, the technology developments will be supported by techno-economic analyses, and a study of elpipes, large cross-section conductors for high-power transfer, will be performed. The superconductor technology developments will accelerate the energy transition towards a low-carbon society by the direct key impacts of the project: • 30% LCOE reduction for offshore windfarm export cables • 15% reduction in total cost of entire offshore windfarms • Possibility to transfer 0.5 GW in the form of H2 and 1 GW electric energy in one combined system • Installation of cables for 90 GW transmission capacity by the consortium partners by 2050 • Creation of 5 000 European jobs within the field of sustainable energy

Location

Country

Norway

Source

Source

EU Funding & Tenders Portal

URL

More Details

Record type

Project

Sector

Fertilizers, Hydrogen, Power Generation (CCGT), Seaport

Article published date

2025-10-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project