Superstructure Replacement REBID
Sector: Bridge • Location: Saint Clairsville, Ohio, United States of America
Source: Dodge USA
This project is to replace the superstructure of an existing bridge. Construction inspection and construction administration services for the rehabilitation of Bridge No. BEL C0010 22090 (SFN 0730688) on CR 10 over Wheeling Creek in Belmont County with a project length of approximately 235 feet.
- Status
- Closed
- Sector
- Bridge, Road, Government, Commercial
- Location
- Saint Clairsville, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Superstructure Replacement REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is to replace the superstructure of an existing bridge. Construction inspection and construction administration services for the rehabilitation of Bridge No. BEL C0010 22090 (SFN 0730688) on CR 10 over Wheeling Creek in Belmont County with a project length of approximately 235 feet. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Saint Clairsville |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Bridge, Road, Government, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- I-95 NB @ ST MARYS RIVER - BRIDGE REHAB
- CR 111/ CAIN CREEK RD--CULVERT & APPR @ CROOKED CREEK TRIB
- JOINT REHABILITATION PROJECT ON 12 BRIDGES IN DIST 5|511440
- SR 112 BRIDGE OVER BOLLINGER CREEK| IMPROVE CR 77 FOR DETOUR
- CR 243/BROOKS ROAD @ ALCOVY RIVER
- I-185 @ SR 116; MOUNTAIN OAK CREEK & HOPEWELL CHURCH RD
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
