Support to OMVG for a complementary economical study of the Sambangalu Hydro Power Project
Sector: Car parking • Location: Gambia
Source: European Union Africa Infrastructure Trust Fund
The Sambangalou Hydro Power Project (SHPP) is a trans-boundary initiative of the Gambia River Basin Organisation (OMVG). The projected capacity of the hydro plant is 128MW. A feasibility study (including a Social Impact Assessment) was completed in 2006, but required additional assessments and an update of existing findings. The EU-AITF grant financed a complementary economic study by the joint-ve
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Close |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Sambangalou Hydro Power Project (SHPP) is a trans-boundary initiative of the Gambia River Basin Organisation (OMVG). The projected capacity of the hydro plant is 128MW. A feasibility study (including a Social Impact Assessment) was completed in 2006, but required additional assessments and an update of existing findings. The EU-AITF grant financed a complementary economic study by the joint-venture BRL Ingénierie - Nodalis to take into account the environmental (in the Niokolo-Koba National Park in Senegal and in the estuarial wetlands in Gambia) and social impacts of the project in the economic analysis. The final report demonstrated a positive economic impact of the project, mainly driven by the savings it would allow on oil-based power generation in the four member countries. However, the environment impacts of the project remain too uncertain to fully evacuate the consequences of the dam on ecosystems and their environmental services. OMVG intends to carry out additional environmental studies to prove the overall positive impact of the project. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Low |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
