logo

Support to the Bogota Metro Line 1 Section 1 Project - (Series 1)

Sector: Mass Transit • Location: Colombia

Source: World Bank

Project
Active

The development objective of Support to the First Bogota Metro Line Section One Project for Colombia is to improve access to jobs and quality transit for public transport users in the area of influence of the Bogota Metro Line 1, Section 1 (PLMB). This project has two components. 1) The first component, Detailed Designs, initial construction works, including inter alia, civil works related to grou

Project Information FAQ

Project Information

5 Q
The project “Support to the Bogota Metro Line 1 Section 1 Project - (Series 1)” is an infrastructure initiative in the Mass Transit sector, located in Colombia. Taiyo aggregates data on it from World Bank.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The development objective of Support to the First Bogota Metro Line Section One Project for Colombia is to improve access to jobs and quality transit for public transport users in the area of influence of the Bogota Metro Line 1, Section 1 (PLMB). This project has two components. 1) The first component, Detailed Designs, initial construction works, including inter alia, civil works related to ground improvement and compacting for the rail yard, and initial pilling installation for the viaduct, and the works supervision contract for the Design‐Finance‐Build‐Operate‐Maintain‐Transfer (DFBOMT) contract. 2) The second component, Institutional and Policy Strengthening, includes strengthening the Borrower’s capacity through inter alia, carrying out of technical studies as needed for the implementation of the PLMB, including studies for the integration of the PLMB with the Integrated Public Transit System (SITP) (operational design, subsidy requirements, fare collection, among others), transit oriented development and land value capture instruments, detailed assessments of Greenhouse Gases (GHG) emissions, local pollutants, noise and vibrations, and institutional strengthening of the Bogota metro company (EMB) and Bogota’s mobility sector, concerns for the security and safety of women in public transport, hiring of technical consultants and other consultants to support safeguard and fiduciary matters, and training.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data