logo

Supporting Renewable Energy Development

Sector: Wind • Location: Mongolia

Source: Asian Development Bank (ADB)

Project
Dropped / Terminated

The project will support increased contributions of clean energy in Mongolia's energy mix while also supporting energy security, efficiency, and resilience. The project will finance the construction of a new 220 kilovolt (kV) transmission line to connect to the 90-megawatt (MW) Erdeneburen hydropower plant (HPP) to the existing grid network, which will increase supply in the Western Energy System

Project Information FAQ

Project Information

5 Q
The project “Supporting Renewable Energy Development” is an infrastructure initiative in the Wind sector, located in Mongolia. Taiyo aggregates data on it from Asian Development Bank (ADB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

dropped / terminated

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project will support increased contributions of clean energy in Mongolia's energy mix while also supporting energy security, efficiency, and resilience. The project will finance the construction of a new 220 kilovolt (kV) transmission line to connect to the 90-megawatt (MW) Erdeneburen hydropower plant (HPP) to the existing grid network, which will increase supply in the Western Energy System (WES), eliminate costly and high-emission imports from the Russian Federation, and facilitate maximized utilization of wind and solar generating capacity. The project also includes a demonstration medium-depth ground source heat pump (MDGSHP) technology connected to the central district heating network in Kharkhorin to increase awareness and acceptance of this as a technically viable alternative to coal-fired heat only boilers in smaller district heating networks. The project will also strengthen institutional capacity across planning and operation of energy assets and in the potential role of cleaner technologies to support a transition to a cleaner energy mix in Mongolia.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data