logo

Supporting the extension of the Cairo metro network

Sector: Education • Location: France

Source: Proparco Groupe AFD (Agence Française de Développement)

Project

The project aims to reduce travel times for residents and reduce traffic congestion, as well as carbon emissions and other pollutants in Cairo. The first 4.3 km-long phase of Line 3 was commissioned in February 2012, and the second 7.7 km-long phase was commissioned in May 2014. The third 18 km-long phase will connect the city center to the West Bank (Giza) via two sections: one towards Imbaba in

Project Information FAQ

Project Information

3 Q
The project “Supporting the extension of the Cairo metro network” is an infrastructure initiative in the Education sector, located in France. Taiyo aggregates data on it from Proparco Groupe AFD (Agence Française de Développement).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project aims to reduce travel times for residents and reduce traffic congestion, as well as carbon emissions and other pollutants in Cairo. The first 4.3 km-long phase of Line 3 was commissioned in February 2012, and the second 7.7 km-long phase was commissioned in May 2014. The third 18 km-long phase will connect the city center to the West Bank (Giza) via two sections: one towards Imbaba in the North, and the other towards Cairo University in the South. Commissioning is scheduled for 2020. It is a high-capacity rapid suburban metro, as is the case with the first two lines. It provides for a combined integration of the line with sections with a deep tunnel, on viaducts and overground. The stations will be built cut-and-cover, while the main sections will be excavated by tunnel boring machines.In addition to supervision, a technical assistance component includes services for training and transferring know-how to the transport authority.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data