logo

Sur LNG Train 4 Expansion

Sector: LNG • Location: Oman

Source: MSN

Project
Awarded

KBR has been awarded a Front End Engineering Design (FEED) contract for the expansion of the Sur LNG Train 4 in Oman. This project aims to enhance the capacity and efficiency of the existing liquefied natural gas facilities.

Status
Closed
Sector
LNG, Natural Gas, Rail
Location
Oman
Updated
22 Jul 2026
Source
MSN

ConstructChat

Ask ConstructChat about Sur LNG Train 4 Expansion

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Sur LNG Train 4 Expansion” is an infrastructure initiative in the LNG sector, located in Oman. Taiyo aggregates data on it from MSN.

Participants

Not available for this record.

Status

Original status

Awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

KBR has been awarded a Front End Engineering Design (FEED) contract for the expansion of the Sur LNG Train 4 in Oman. This project aims to enhance the capacity and efficiency of the existing liquefied natural gas facilities.

Location

Country

Oman

Source

Source

MSN

URL

More Details

Record type

Project

Sector

LNG, Natural Gas, Rail

Article published date

2025-01-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project