Surat Metro Rail Project - Underground Package CS2
The owner, status and timeline of this project. A free account opens every field.
Source: Metro Rail Today
The project involves the construction of the underground section of Corridor-1 of the Surat Metro Rail, including tunneling works between Kapodra Ramp and Dream City Ramp with six underground stations. The tunneling was completed using Earth Pressure Balance Tunnel Boring Machines (TBMs) under dense urban areas with minimal surface disruption.
- Status
- Under Construction
- Sector
- Mass Transit, Rail, Tunnel
- Location
- Surat, Gujarat, India
- Updated
- 22 Jul 2026
- Source
- Metro Rail Today
ConstructChat
Ask ConstructChat about Surat Metro Rail Project - Underground Package CS2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the construction of the underground section of Corridor-1 of the Surat Metro Rail, including tunneling works between Kapodra Ramp and Dream City Ramp with six underground stations. The tunneling was completed using Earth Pressure Balance Tunnel Boring Machines (TBMs) under dense urban areas with minimal surface disruption. |
Original sector | Metro Rail |
Location
Country | India |
State | Gujarat |
City | Surat |
Source
Source | Metro Rail Today |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Rail, Tunnel |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
