Surat Metro Rail Project Viaduct Trial Run
Sector: Bridge • Location: Surat, Gujarat, India
Source: thehawk.in
Trial run of Metro train has commenced on a key stretch of the Surat Metro Rail Project after the completion of an 8.5 km-long viaduct between Dream City and Althan Tenament. The elevated section on the designated route has been completed, and testing operations have started involving around 500 hours of train running to assess the system’s performance, reliability and safety before passenger serv
- Status
- Under Construction
- Sector
- Bridge, Rail, Mass Transit, Road
- Location
- Surat, Gujarat, India
- Updated
- 22 Jul 2026
- Source
- thehawk.in
ConstructChat
Ask ConstructChat about Surat Metro Rail Project Viaduct Trial Run
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Trial run of Metro train has commenced on a key stretch of the Surat Metro Rail Project after the completion of an 8.5 km-long viaduct between Dream City and Althan Tenament. The elevated section on the designated route has been completed, and testing operations have started involving around 500 hours of train running to assess the system’s performance, reliability and safety before passenger services are introduced. Civil construction of all seven station buildings along the route has also been finished, with ongoing work on entry and exit points and interior finishing activities. The project is under the guidance of Chief Minister Bhupendra Patel and aims to strengthen urban transport infrastructure in Surat. |
Original sector | Urban Transport |
Location
Country | India |
State | Gujarat |
City | Surat |
Source
Source | thehawk.in |
URL |
More Details
Record type | Project |
Sector | Bridge, Rail, Mass Transit, Road |
Article published date | 2026-03-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in India
- Kharar - Ludhiana section of NH - 95 (new NH - 05)
- NK Toll Road Limited
- Mumbai Nasik Expressway Limited
- Nardhana ROB (Railway over Bridge)
- Transstroy Bhopal Berasia Sironj Tollways Private Limited
- MBL (MP) Toll Road Company Limited
- Indore-Edelabad Road
- Soma Isolux Varanasi Aurangabad Tollway Private Limited
