Surf City Bridge Pedestrian Lighting Replacement Project
Sector: Bridge • Location: Surf City, North Carolina, United States
Source: WWAYTV3
The project involves replacing the pedestrian lighting on the Surf City Bridge. NCDOT crews will begin moving in equipment on September 1, 2025, with lighting replacement starting on September 9, 2025, and expected completion by October 25, 2025. Partial narrowing of the walkway is expected during work days Monday through Thursday, with the walkway fully open Friday through Sunday.
- Status
- Under Construction
- Sector
- Bridge, Government
- Location
- Surf City, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- WWAYTV3
ConstructChat
Ask ConstructChat about Surf City Bridge Pedestrian Lighting Replacement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves replacing the pedestrian lighting on the Surf City Bridge. NCDOT crews will begin moving in equipment on September 1, 2025, with lighting replacement starting on September 9, 2025, and expected completion by October 25, 2025. Partial narrowing of the walkway is expected during work days Monday through Thursday, with the walkway fully open Friday through Sunday. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Surf City |
Source
Source | WWAYTV3 |
URL |
More Details
Record type | Project |
Sector | Bridge, Government |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States
- Atlas Air Worldwide and Titan Aviation Holdings Announce Financing Facilities with CDPQ, BNP Paribas, and volofin
- Route 29 Tunnel, Trenton, NJ
- Ortega Highway Interchange Replacement Project
- Elgin O’Hare Western Access Project, Illinois
- Queen Elizabeth Way Widening
- I-485 Charlotte Outer Loop, North Carolina
- Kosciuszko Bridge Replacement Project, New York, US
- Complete 540 (Triangle Expressway Southeast Extension), North Carolina
