Surgut Housing Refurbishment Project
Sector: Government • Location: Russia
Source: European Bank for Reconstruction and Development (EBRD)
The proposed project would involve loan to the City of Surgut (the City), a municipality in the Khanty-Mansi Autonomous Okrug (the Okrug). The project would focus on pilot programme to refurbish rapidly depreciating municipal and private housing stock. The project would also focus on development of long term municipal housing policy and institutional strengthening of the municipal housing agency t
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | complete |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The proposed project would involve loan to the City of Surgut (the City), a municipality in the Khanty-Mansi Autonomous Okrug (the Okrug). The project would focus on pilot programme to refurbish rapidly depreciating municipal and private housing stock. The project would also focus on development of long term municipal housing policy and institutional strengthening of the municipal housing agency to be established in the due course of project implementation. The project is likely to have significant demonstration effect as it will establish a foundation for a sustainable municipal housing policy in the city. The transition potential of the operation relates to: (i) development of a long term sustainable operational approach for the housing refurbishment through an arms length municipal housing company; (ii) development of a long term housing policy and establishment of the arm-length housing development agency to take charge of future housing refurbishment programmes in the City (ii) encouragement of private sector involvement and competition into provision of housing management and maintenance services. The project will also contribute towards strengthening of corporate governance standards and transparency in housing development agency through introduction of IFRS for financial reporting and regular external audits. The municipality of Surgut will be the Borrower. The loan up to RUB 700 million (EUR 20.4 million) to the City. RUB 1,344 million (EUR 40 million). A housing project such as this project has specific environmental impacts which, however, can be readily identified and mitigated through adequate measures and application of good international practice. For the above reasons, the EBRD has classified the project B/1 requiring an Environmental Analysis and Audit of the proposed site and associated facilities. An environmental analysis of the existing situation and future impact has been carried out as part of the feasibility study by independent consultants funded by the EU. The analysis confirms that there are no significant environmental issues associated with the Project. Further documentation on the project will be reviewed by the Bank in due course. The review confirms that there are no significant environmental impacts associated with the project and site. The City will need to ensure that the re-housing process is conducted in accordance with the EBRD’s Environmental Policy requirements. The newly established municipal housing development agency ( MHDA) will be required to supervise private contractors retained for project implementation in terms of compliance with prescribed Russian and EU environmental, health, safety and labour standards during project implementation. The Project will involve significant social and environmental opportunities: improvements in housing conditions and energy saving through lower demand for heat. The Bank will evaluate the project’s compliance with the applicable environmental and social requirements during the lifetime of the project by reviewing annual environmental reports (AER) prepared for the project covering: (1) on-going project-specific environmental, health and safety performance including legal compliance, and (ii) the status of implementation of environmental and social mitigation measures. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Government projects in Russia
- Dzhubga – Lazarevskoye – Sochi Gas Pipeline, Black Sea
- Sakhalin II Crude Oil and Liquified Natural Gas, Sakhalin Island, Russia
- Chayandinskoye Field, Yakutia
- SABMiller Ulyanovsk Brewery
- Solagran Biotech Plant, Tomsk, Siberia, Russia
- NovaMedica Pharmaceutical Plant, Kaluga
- Takeda Pharmaceutical Manufacturing Plant, Yaroslavl, Russia
- Searle Pharma Medication Production Plant, Moscow
