logo
ProjectUnder Construction

Surkhan–Puli-Khumri Power Transmission Project

Sector: Power Generation (CCGT) • Location: Afghanistan

Source: Daryo

The Surkhan–Puli-Khumri power transmission project aims to enhance electricity supply between Uzbekistan and Afghanistan. The project includes the addition of new substations and networks to optimize construction and increase the use of localized materials, reducing the estimated cost from $252 million to $222 million.

Status
Under Construction
Sector
Power Generation (CCGT)
Location
Afghanistan
Updated
22 Jul 2026
Source
Daryo

ConstructChat

Ask ConstructChat about Surkhan–Puli-Khumri Power Transmission Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Surkhan–Puli-Khumri Power Transmission Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Afghanistan. Taiyo aggregates data on it from Daryo.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Surkhan–Puli-Khumri power transmission project aims to enhance electricity supply between Uzbekistan and Afghanistan. The project includes the addition of new substations and networks to optimize construction and increase the use of localized materials, reducing the estimated cost from $252 million to $222 million.

Original sector

Energy

Budget

Location

Country

Afghanistan

Source

Source

Daryo

URL

More Details

Record type

Project

Sector

Power Generation (CCGT)

Article published date

2025-03-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project