Surkhan–Puli-Khumri Power Transmission Project
Sector: Power Generation (CCGT) • Location: Afghanistan
Source: Daryo
The Surkhan–Puli-Khumri power transmission project aims to enhance electricity supply between Uzbekistan and Afghanistan. The project includes the addition of new substations and networks to optimize construction and increase the use of localized materials, reducing the estimated cost from $252 million to $222 million.
- Status
- Under Construction
- Sector
- Power Generation (CCGT)
- Location
- Afghanistan
- Updated
- 22 Jul 2026
- Source
- Daryo
ConstructChat
Ask ConstructChat about Surkhan–Puli-Khumri Power Transmission Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Surkhan–Puli-Khumri power transmission project aims to enhance electricity supply between Uzbekistan and Afghanistan. The project includes the addition of new substations and networks to optimize construction and increase the use of localized materials, reducing the estimated cost from $252 million to $222 million. |
Original sector | Energy |
Budget |
Location
Country | Afghanistan |
Source
Source | Daryo |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2025-03-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
