Surmont Phase 2 Oil Sands Project, Alberta

Sector: Commercial • Location: World

Source: Hydrocarbon Technology

Project
Closed

Surmont Phase 2 Oil Sands project involved the expansion of the Surmont steam-assisted gravity drainage (SAGD) plant to increase its production capacity from the existing 27,000 barrels of bitumen a day to 136,000 barrels of bitumen a day. The Surmont site is located approximately 63km south-east of Fort McMurray, Alberta, in the Athabasca oil sands region. It covers an area of approximately 567k

Project Information FAQ

Project Information

4 Q
The project “Surmont Phase 2 Oil Sands Project, Alberta” is an infrastructure initiative in the Commercial sector, located in World. Taiyo aggregates data on it from Hydrocarbon Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Surmont Phase 2 Oil Sands project involved the expansion of the Surmont steam-assisted gravity drainage (SAGD) plant to increase its production capacity from the existing 27,000 barrels of bitumen a day to 136,000 barrels of bitumen a day. The Surmont site is located approximately 63km south-east of Fort McMurray, Alberta, in the Athabasca oil sands region. It covers an area of approximately 567km². ConocoPhillips Canada holds a 50% interest in the field and is the operator, while Total E&P Canada holds the remaining 50% stake in the project. The Surmont Phase 2 project was sanctioned by the partners in January 2010 and construction activities commenced in the same month. It is the biggest SAGD production facility built in a single phase. Plans are in place to implement additional phases to further enable the production from the facility to reach an ultimate capacity of 283,000 barrels a day for more than 30 years. The Athabasca Oil Sands Project is the latest fully integrated oil sands development in 25 years. ConocoPhillips launched the Surmont SAGD pilot project comprising two 350m-long well pairs in 1997, and made the first 3D seismic acquisition in 1998. The third well pair, measuring about 700m, was drilled in 2000. Total acquired a 43.5% interest in the project in 2002 and increased it to 50% in 2005. Based on 36 well pairs drilled in three series, Surmont Phase 1 was launched in 2003, steam injections at 20 wells started in mid-2007, and first oil was produced in October 2007. Peak production from the facility was achieved in the second quarter of 2013. Project activities under the Phase 2 primarily involved the installation of additional well pads, central processing facilities, storage tanks, pipelines and water treatment facilities. Construction of additional camps, water source and disposal wells, power lines, substation, and roads was also completed. The partners in the project entered into a terminal services agreement with Enbridge in May 2013, under which, the latter agreed to expand its Cheecham Terminal with an investment of approximately $300m to accommodate the additional production from Surmont Phase 2. The terminal expansion project involved the installation of two 450,000 barrel blend tanks, conversion of an existing blend tank to accommodate diluent, installation of receipt, and distribution manifolds to facilitate transfers to its Waupisoo Pipeline. An upgrade to the associated measurement equipment also took place. The SAGD technology involves drilling of horizontal well pairs and continuous injection of steam into the upper well to heat the bitumen and reduce its viscosity. The heated bitumen then drains into the lower well along with the hot water. Bitumen in the lower well is then pumped to the surface where water is separated from the bitumen. The recovered water is treated and recycled to the steam generators while the bitumen is diluted and conveyed by pipeline for upgrading and refining. Bantrel was awarded the front-end engineering contract for the Surmont Phase 2 in May 2008. The company was further awarded the engineering, procurement and construction (EPC) contract for the entire project, including the central processing facilities and field facilities areas, in May 2010. Its affiliate, Bantrel Management Services, provided the construction management services for the project. PCL Industrial Constructors installed 417 piperack and equipment modules, 53,000 linear metres (LM) of ship loose pipe, and pressure test 153,000LM of pipe. The installation of 1.7 million linear metres of electrical cable was performed by PCL Intracon Power. Certain electrical and instrumentation installation works at the site were performed by Chemco. PLC Energy was also involved during Phase 1, installing 23km of above-ground pipelines that connected two well pads to the central processing plant, and supplied the equipment modules for water and disposal wells. Cahill was contracted to install nine SAGD well pads for the project. It also performed the installation of equipment modules, electrical houses, pump houses, pipe racks, electrical, instrumentation, insulation, scaffolding and civil works. The pipe fabrication works and assembly of 99 well pad modules and fabrication of all installed pipe spool were performed by Aecon. The entire carbon steel pipe (seamless, welded, high-yield, and specialty) needed for the project was supplied by Van Leeuwen. Keller was awarded the contract to supply and install the driven steel pipe piles in CPFs and the field facilities (FF). SNC Lavalin was contracted to design, build, operate, and maintain a workforce lodge on the site to accommodate 2,500 workers. It further subcontracted ASI Water to improve the existing water and wastewater treatment systems for the buildings. Construction management services for the water treatment process facilities at the site were provided by Drakken. Aker Solutions supplied a slop oil treater package for the project. The inspection works for the project installation activities were performed by BlackComb Inspections. The environmental monitoring services at the project site were rendered by Hatfield and Millennium EMS Solutions.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data