logo

Surrey - Nicomekl River Dyke Rehabilitation between 16900 Blk and 184 St

The status, timeline and source of this project. A free account opens every field.

Source: Infrastructure Canada

Project
Pre-Construction

City of Surrey is committed to adapting to the ongoing effects of climate change through the design and construction of resilient and environmentally friendly infrastructure. In the last decade, Surrey has invested considerable resources in identifying the most flood vulnerable areas within its existing flood plains and has identified this segment of dyke to be at risk of overtopping. Climate chan

Status
Prospective
Sector
Mass Transit, Cement, Rail, Road, Raw Materials, Government
Location
British Columbia, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Surrey - Nicomekl River Dyke Rehabilitation between 16900 Blk and 184 St

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Surrey - Nicomekl River Dyke Rehabilitation between 16900 Blk and 184 St” is an infrastructure initiative in the Mass Transit sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

pre-construction

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

City of Surrey is committed to adapting to the ongoing effects of climate change through the design and construction of resilient and environmentally friendly infrastructure. In the last decade, Surrey has invested considerable resources in identifying the most flood vulnerable areas within its existing flood plains and has identified this segment of dyke to be at risk of overtopping. Climate change-driven increase in rainfall intensity and frequency, further demands significant dyke upgrades to meet the storm frequency levels that will cause costly dyke over-topping and dyke breaches in the coming years. The proposed project aims at enhancing the flood resilience within a dyke segment ranked as a segment of major consequence (appendix iv - NHC 2021) in the face of increased flooding frequencies and intensities (appendix iii - NHC 2015). The proposed works includes the replacement of three flood boxes and rehabilitation of two spillways, and rehabilitating the dyke crest by adding approximately 300mm of fill to approximately 2 km of dyke on the north bank of the Nicomekl River between 16900 Blk and 184 St. This work will involve surveying, trucking, loading, unloading, placing and compacting dyke fill, construction of temporary access roads, installation of concrete headwalls and flood conveyance infrastructure, erosion control work, ground preparation and surface restoration. By rehabilitating the dyke, floodboxes and spillways increased flood control for the following assets: - Over 1km of Hwy 15, a regional link to Pacific Highway Border - Over 400 ha of agricultural lands - Portion of 48th Ave - Over 40 buildings (homes, barns etc.) -Portion of 184th Street and other transportation links -0.5km section of Roberts Bank Railway corridor (BC Railway)

Original sector

Climate Resilience

Location

Country

Canada

State

British Columbia

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Mass Transit, Cement, Rail, Road, Raw Materials, Government

Article published date

2025-07-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project