logo

Surrey - Nicomekl River Dyke Rehabilitation between 16900 Blk and 184 St

Sector: Mass Transit • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
Pre-Construction

City of Surrey is committed to adapting to the ongoing effects of climate change through the design and construction of resilient and environmentally friendly infrastructure. In the last decade, Surrey has invested considerable resources in identifying the most flood vulnerable areas within its existing flood plains and has identified this segment of dyke to be at risk of overtopping. Climate chan

Project Information FAQ

Project Information

3 Q
The project “Surrey - Nicomekl River Dyke Rehabilitation between 16900 Blk and 184 St” is an infrastructure initiative in the Mass Transit sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

pre-construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

City of Surrey is committed to adapting to the ongoing effects of climate change through the design and construction of resilient and environmentally friendly infrastructure. In the last decade, Surrey has invested considerable resources in identifying the most flood vulnerable areas within its existing flood plains and has identified this segment of dyke to be at risk of overtopping. Climate change-driven increase in rainfall intensity and frequency, further demands significant dyke upgrades to meet the storm frequency levels that will cause costly dyke over-topping and dyke breaches in the coming years. The proposed project aims at enhancing the flood resilience within a dyke segment ranked as a segment of major consequence (appendix iv - NHC 2021) in the face of increased flooding frequencies and intensities (appendix iii - NHC 2015). The proposed works includes the replacement of three flood boxes and rehabilitation of two spillways, and rehabilitating the dyke crest by adding approximately 300mm of fill to approximately 2 km of dyke on the north bank of the Nicomekl River between 16900 Blk and 184 St. This work will involve surveying, trucking, loading, unloading, placing and compacting dyke fill, construction of temporary access roads, installation of concrete headwalls and flood conveyance infrastructure, erosion control work, ground preparation and surface restoration. By rehabilitating the dyke, floodboxes and spillways increased flood control for the following assets: - Over 1km of Hwy 15, a regional link to Pacific Highway Border - Over 400 ha of agricultural lands - Portion of 48th Ave - Over 40 buildings (homes, barns etc.) -Portion of 184th Street and other transportation links -0.5km section of Roberts Bank Railway corridor (BC Railway)

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data