Suruç Water Tunnel, Sanliurfa

Sector: Car parking • Location: World

Source: Water Technology

Project
Closed

The Atatürk Dam on the Euphrates River will provide water for irrigation through the Suruç Water Tunnel. Seli supplied the 7.83m-diameter DSU TBM for the tunnel project. Image courtesy of SELI S.p.a. The 17.2km-long tunnel transfers approximately 90t of water per second. Image courtesy of WEG. WEG supplied eight medium-voltage asynchronous motors for the project. Suruç Water Tunnel is a 17.2km-lo

Project Information FAQ

Project Information

5 Q
The project “Suruç Water Tunnel, Sanliurfa” is an infrastructure initiative in the Car parking sector, located in World. Taiyo aggregates data on it from Water Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Atatürk Dam on the Euphrates River will provide water for irrigation through the Suruç Water Tunnel. Seli supplied the 7.83m-diameter DSU TBM for the tunnel project. Image courtesy of SELI S.p.a. The 17.2km-long tunnel transfers approximately 90t of water per second. Image courtesy of WEG. WEG supplied eight medium-voltage asynchronous motors for the project. Suruç Water Tunnel is a 17.2km-long irrigation and drinking water supply tunnel located in the rural District of Suruç, at the Sanliurfa Province in Turkey. It is the country’s longest water transmission tunnel and the fifth-longest in the world. It is being constructed by Turkish contractor Ilci Insaat Sanayi Ve Ticaret. The tunnel provides water to 94.81ha of irrigation land and supplies drinking water to the city of Suruç and its 135 residential areas. Construction of the tunnel commenced in 2009 and was completed in March 2014. Turkey and the Middle East face draught situations due to severe shortage of water for drinking and irrigation purposes caused by scarce rain. The Headworks Reservoir, located north of Griffith Park in the city of Los Angeles. Suruç water tunnel is part of the large sustainable, multi-sector, integrated south-eastern Anatolia project (GAP), which aims to improve Turkey’s agricultural productivity and reduce poverty in the south-eastern provinces. Total estimated cost of the GAP is $32bn. The programme will include the construction of 22 dams, 19 hydro-electric plants and an irrigation system being built in the Euphrates, Tigris and Upper Mesopotamia basins to serve approximately 1.7 million hectares of land. Suruç water tunnel has the capacity to carry approximately 90m³/s of water from the Ataturk Dam to Suruç Valley to irrigate the south-eastern Anatolian regions. The project is expected to contribute approximately $90m annually to the country’s economy, provide direct employment opportunities to 190,000 people and create further indirect jobs. Suruç water tunnel was built by a public-private partnership comprising the State Agency Devlet Su Isleri (DSI), the General Directorate of Rural Services (GRDS) and the private sector. The tunnel measures 17.2km in length and is located at an altitude of approximately 580m with an average downhill slope of 0.49%. It was bored using a double shield universal (DSU) tunnel boring machine (TBM) supplied by Seli. The TBM is considered the world’s third-biggest machine measuring 152m in length and 7.83m in diameter. The cutter head of the machine is 17in and the speed is 7.5rpm at a power capacity of 2,205kW. A 30cm-thick hexagonal pre-cast concrete segmental lining was laid throughout. Eight medium-voltage asynchronous motors, each four metres-tall and weighing 34t were installed at the tunnel to draw water from the dam in Euphrates River and deliver it to the irrigation canal. The project also involved construction of laboratory buildings and a factory spread across 5,000m² of closed space for manufacturing segments that were used in tunnel coverage, concrete facilities and concrete cure facilities. Ilci Insaat Sanayi Ve Ticaret signed a €15m (approximately $20.43m) contract with Seli in April 2009. The scope of the contract included supplying TBM, auxiliary equipment, materials, spare parts and cutters for the tunnel construction. Seli also provided technical assistance in assembling and erecting the TBM. In September 2013, WEG supplied the pumps and equipment to move the water from the dam to the irrigation canal.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data