Surya Vidyut Limited
Sector: Commercial • Location: India
Source: World Bank Group
Surya Vidyut Limited, a wholly owned subsidiary of CESC Limited, entered into an agreement with Gujarat Government, to develop 26 MW wind power project at Surendranagar district of Gujarat. The project would be executed under the Gujarat Wind Power Policy-2013. The electricity generated from the project would be evacuated to the state grid through Northern, Eastern, Western and North-Eastern grid
- Status
- Prospective
- Sector
- Commercial, Wind, Government, Power Generation (CCGT), Power Transmission
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Surya Vidyut Limited
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Surya Vidyut Limited, a wholly owned subsidiary of CESC Limited, entered into an agreement with Gujarat Government, to develop 26 MW wind power project at Surendranagar district of Gujarat. The project would be executed under the Gujarat Wind Power Policy-2013. The electricity generated from the project would be evacuated to the state grid through Northern, Eastern, Western and North-Eastern grid of India. Surya Vidyut Limited was expected to sell all the power to the Gujarat state utility company (GUVNL) through a PPA. The APPC (Average Power Purchase Cost) base tariff as per GERC (State Electricity Regulator) tariff order was US$ 0.068/Unit (INR 4.15 per unit @61 INR/USD) for the 25 years of operation. The transmission charges would be paid by SVL to the state transmission utility. The project was eligible for CDM benefits as well. The sharing of net proceeds on account of CDM benefits realized through sale of CER generated from corresponding annual energy generation would be as follows: 100% of net proceeds through sale of CER generated in the 1st year after the date of commercial operation of the wind power project shall be retained by the eligible unit. In the 2nd year, the share of the beneficiary shall be 10% which shall be progressively increased by 10% every year till it reaches 50% in the 6th year; thereafter the proceeds shall be shared in equal proportion by the eligible unit and the GUVNL. The project attained financial closure on 14th August 2014 at a debt equity ratio of 70/30. The estimated project cost at the time of financial closure was US$ 26mn (INR 1589.2mn @61 INR/USD). Financing comprised a 14-year term loan of US$ 18.2mn (INR 1112.4mn) and sponsor equity of US$ 7.8mn (INR 476.8mn).The loan had a repayment schedule of 53 quarterly installments. The loan was provided by Yes Bank. The project was expected to be commissioned by December 2015. |
Original sector | Energy |
Budget |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Wind, Government, Power Generation (CCGT), Power Transmission |
Article published date | 2024-06-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in India
- Mundra Ultra Mega Power Plant Gujarat
- ONGC Tripura Power Plant
- Salaya Power Project Gujarat
- Cable-stayed bridge project in the Chambal River
- Construction services for the wellness center component of NexusPark for the Columbus Regional Health and the City of Columbus in Indiana (United States)
- Mumbra Bypass Project
- Essel Gwalior Shivpuri Toll Roads Private Limited
- Mytrah Energy Limited- 100.3MW Savalsang Windfarm
