Suspended timber floor insulation project
The status, timeline and source of this project. A free account opens every field.
Source: EU Funding & Tenders Portal
In the UK, 6.2 million1 homes, in the Netherlands, 2.65 million2 homes built before the 1920s have uninsulated suspended timber floors, and based on our preliminary research across the EU (such as Belgium, NorthFrance, North-Germany) it is anticipated that further ~10 millions of homes have similar floor construction due the same climatic and ground-water conditions, resulting in a 18.3 million ho
- Status
- Closed
- Sector
- Forest Products and Packaging, Residential, Geothermal, Water Supply and Storage
- Location
- United Kingdom
- Updated
- 22 Jul 2026
- Source
- EU Funding & Tenders Portal
ConstructChat
Ask ConstructChat about Suspended timber floor insulation project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | ended |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In the UK, 6.2 million1 homes, in the Netherlands, 2.65 million2 homes built before the 1920s have uninsulated suspended timber floors, and based on our preliminary research across the EU (such as Belgium, NorthFrance, North-Germany) it is anticipated that further ~10 millions of homes have similar floor construction due the same climatic and ground-water conditions, resulting in a 18.3 million homes European market. Alongside wall and loft insulation - where significant traction has already been made across the European and global insulation market - floor insulation is essential for maintaining the thermal coherence of the property and eliminating unwanted draughts. Moreover, heat loss through floors accounts for up to 20-25% of the total heat loss of older properties. Despite the above, floor insulation has not become widespread yet, which can be attributed to three major factors: i) householder resistance to disruption caused by floorboard and carpet removal; ii) the inability to crawl below the floorboards due to constrained floor depths in Europe; iii) high costs (£4,000 per property) and resultant long payback period (~25+ years). Solution: To exploit this opportunity, SHS have developed a prototype design for a low cost, automated under floor insulation system (Ufloor) to i) eliminate structural disruption; ii) speed up the insulation process; iii) make suspended timber floor insulation accessible to the mass market. It achieves this by using a proprietary telescopic applicator (with an integrated camera for guiding movement) that can access the subfloor void through airbricks. Economic Impact: Successful deployment of Ufloor will enable SHS to provide a solution that is 60% cheaper, 5x faster and 80% less disruptive than incumbent methods, saving up to 2,900 kWh (£150) per year. By the end of year 5, this translates into 100,000 new installs, providing additional revenue o £13m to SHS with an IRR of over 50% to seed investors. |
Location
Country | United Kingdom (UK) |
Source
Source | EU Funding & Tenders Portal |
URL |
More Details
Record type | Project |
Sector | Forest Products and Packaging, Residential, Geothermal, Water Supply and Storage |
Article published date | 2026-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
