Suspension Bridge on the A-6 in Las Rozas, Madrid
Sector: Bridge • Location: Madrid, Spain
Source: Ferrovial
Ferrovial Business Lines Projects Suspension Bridge on the A-6 in Las Rozas, Madrid Madrid, Spain €7.74 M Construction Bid Budget 39m Height of the Tower 2244m² Board Surface Area The new bridge on the A-6 in Las Rozas, a suburb of Madrid, is an asymmetric suspension bridge with a span of 102 m between supports. The main span is suspended from a tower by 9 pairs of cables located on the median.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Close |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Ferrovial Business Lines Projects Suspension Bridge on the A-6 in Las Rozas, Madrid Madrid, Spain €7.74 M Construction Bid Budget 39m Height of the Tower 2244m² Board Surface Area The new bridge on the A-6 in Las Rozas, a suburb of Madrid, is an asymmetric suspension bridge with a span of 102 m between supports. The main span is suspended from a tower by 9 pairs of cables located on the median. This tower is formed by two large sails or inclined triangular cells with a metal section that reaching its apex at 39 m above ground. The anchoring triangle is inserted at the highest point of the triangular cells, and it is formed by two large parallel plates, from where the frontal cables fork off like a fan. On the triangular porticos, the compressed front tips are differentiated from the the rigid back retaining straps that anchor the tower to the counterweight on the inside of the abuttment. Horizontal elements—or braces— link both elements and close the triangles in their inclined plane. The wires are put in a polyethylene sheath or with forked terminals, and they sustain the mixed deck every 9 m. The deck, with a total width of 20 m (plus twospring lines, 1.08 m each), has two roadways, each with two lanes 3.25 m wide, separated by a pedestrian median 5,80 m wide. Structurally, the deck is mixed, formed by a closed metallic box 8.30 m wide and a span of at most 1.50 m, with a lentil-shaped bottom. The span decreases as it moves from the center to the sides. The metallic box has four beam webs, serving as the two anchor point centers for the suspension cables, which are fixed on the top of the tower. To complete the deck's span,there are steel ribs along the side measuring 5.80 m long, with spans that vary circularly from 1 m at the box girder to 0.2 m at the ends, while the inferior wing varies in width from 70 to 30 cm. On the other hand, there are stiffener frames on the box every 3 m and bulkheads every 9 m. The rhythm of these stiffeners for the box are from 2 to 1. The transverse section of the deck is completed by an upper slap of reinforced concrete 22 cm in span. The building process consisted of launching the metallic sections of the deck with powerful cranes, allowing them to rest on the temporary towers that were withdrawn once suspension began. This allowed the construction of the structure without interfering with traffic on the A-6 or its service roads. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
