Suspension of NH-715 Expansion
Suspended · Assam · Last reported Feb 2025
Source: Pratidin Time
The Gauhati High Court has suspended the expansion and reconstruction work of the National Highway-715 between Kaliabor Tiniali and Numaligarh in response to a Public Interest Litigation filed by local citizens.
- Status
- Failure
- Sector
- Road
- Location
- Assam, India
- Updated
- 22 Jul 2026
- Source
- Pratidin Time
ConstructChat
Ask ConstructChat about Suspension of NH-715 Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | suspended |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Gauhati High Court has suspended the expansion and reconstruction work of the National Highway-715 between Kaliabor Tiniali and Numaligarh in response to a Public Interest Litigation filed by local citizens. |
Location
Country | India |
State | Assam |
Source
Source | Pratidin Time |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2025-02-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in India
- Dholera Solar Park Gujarat
- Sugen 1100MW CCGT Akhakhol Gujarat
- ONGC Tripura Power Plant
- Cable-stayed bridge project in the Chambal River
- Mumbra Bypass Project
- Essel Gwalior Shivpuri Toll Roads Private Limited
- RattanIndia Power Limited (Amravati Thermal Power Project)
- GVRMP Belgaum Khanapur Tollway Private Limited
