Susquehanna River Bridge Replacement
One of 10,000+ projects Taiyo tracks in Maryland.
Source: Dodge USA
Project details - Phase 1 consists of the construction of a new two-track bridge west (the West Bridge ) of the existing Susquehanna River Rail Bridge and associated work, including five miles of new approach trackwork, undertrack bridges, retaining walls, interlocking work, relocation of existing utilities, civil work, and the demolition and removal of the existing Susquehanna River Rail Bridge.
- Status
- Closed
- Sector
- Bridge, Power Transmission, Rail, Mass Transit, Government, Commercial, Power Generation (CCGT)
- Location
- Perryville, Maryland, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Susquehanna River Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project details - Phase 1 consists of the construction of a new two-track bridge west (the West Bridge ) of the existing Susquehanna River Rail Bridge and associated work, including five miles of new approach trackwork, undertrack bridges, retaining walls, interlocking work, relocation of existing utilities, civil work, and the demolition and removal of the existing Susquehanna River Rail Bridge. Phase 2 will consist of the construction of a new two-track bridge (the East Bridge ) east of the... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Maryland |
City | Perryville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Bridge, Power Transmission, Rail, Mass Transit, Government, Commercial, Power Generation (CCGT) |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- I-95 NB @ ST MARYS RIVER - BRIDGE REHAB
- CR 111/ CAIN CREEK RD--CULVERT & APPR @ CROOKED CREEK TRIB
- JOINT REHABILITATION PROJECT ON 12 BRIDGES IN DIST 5|511440
- SR 112 BRIDGE OVER BOLLINGER CREEK| IMPROVE CR 77 FOR DETOUR
- CR 243/BROOKS ROAD @ ALCOVY RIVER
- I-185 @ SR 116; MOUNTAIN OAK CREEK & HOPEWELL CHURCH RD
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
