logo
ProjectClosed

Susquehanna River Bridge Replacement

One of 10,000+ projects Taiyo tracks in Maryland.

Source: Dodge USA

Project details - Phase 1 consists of the construction of a new two-track bridge west (the West Bridge ) of the existing Susquehanna River Rail Bridge and associated work, including five miles of new approach trackwork, undertrack bridges, retaining walls, interlocking work, relocation of existing utilities, civil work, and the demolition and removal of the existing Susquehanna River Rail Bridge.

Status
Closed
Sector
Bridge, Power Transmission, Rail, Mass Transit, Government, Commercial, Power Generation (CCGT)
Location
Perryville, Maryland, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Susquehanna River Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Susquehanna River Bridge Replacement” is an infrastructure initiative in the Bridge sector, located in Perryville, Maryland, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Project details - Phase 1 consists of the construction of a new two-track bridge west (the West Bridge ) of the existing Susquehanna River Rail Bridge and associated work, including five miles of new approach trackwork, undertrack bridges, retaining walls, interlocking work, relocation of existing utilities, civil work, and the demolition and removal of the existing Susquehanna River Rail Bridge. Phase 2 will consist of the construction of a new two-track bridge (the East Bridge ) east of the...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Maryland

City

Perryville

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Power Transmission, Rail, Mass Transit, Government, Commercial, Power Generation (CCGT)

Article published date

2024-04-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project