logo

Susquehanna River Hydroelectric Dam Repowering

Sector: Power Generation (CCGT) • Location: Pennsylvania, United States

Source: News From The States

Project
Planned

A $3 billion deal between Google and Brookfield to repower two 1930s-era hydroelectric dams on the Susquehanna River.

Status
Prospective
Sector
Power Generation (CCGT), Hydro, Water Supply and Storage
Location
Pennsylvania, United States of America
Updated
22 Jul 2026
Source
News From The States

ConstructChat

Ask ConstructChat about Susquehanna River Hydroelectric Dam Repowering

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Susquehanna River Hydroelectric Dam Repowering” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Pennsylvania, United States. Taiyo aggregates data on it from News From The States.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A $3 billion deal between Google and Brookfield to repower two 1930s-era hydroelectric dams on the Susquehanna River.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Pennsylvania

Source

Source

News From The States

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Hydro, Water Supply and Storage

Article published date

2025-09-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project