logo
ProjectPlanning Schematics

Susquehanna River Rail Bridge Replacement

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Two new two-track fixed bridges. The new bridges will provide 60 feet of fixed vertical clearance and 235 feet of horizontal clearance and remove the old remnant piers. The west bridge will be for MARC and freight train traffic and the east bridge will be for Amtrak high-speed services. Phase 1 consists of the construction of a new two-track bridge west (the West Bridge ) of the existing Susquehan

Status
Prospective
Sector
Mass Transit, Commercial, Rail, Bridge, Government
Location
Perryville, Maryland, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Susquehanna River Rail Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Susquehanna River Rail Bridge Replacement” is an infrastructure initiative in the Mass Transit sector, located in Perryville, Maryland, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Two new two-track fixed bridges. The new bridges will provide 60 feet of fixed vertical clearance and 235 feet of horizontal clearance and remove the old remnant piers. The west bridge will be for MARC and freight train traffic and the east bridge will be for Amtrak high-speed services. Phase 1 consists of the construction of a new two-track bridge west (the West Bridge ) of the existing Susquehanna River Rail Bridge and associated work, including five miles of new approach trackwork, undertr...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Maryland

City

Perryville

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Mass Transit, Commercial, Rail, Bridge, Government

Article published date

2024-09-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project