logo

Sustainable energy access in Eastern Indonesia - Sulawesi and Nusa Tenggara Power Grid Development Program (RBL)

Sector: Cement • Location: Indonesia

Source: KFW Bank aus Verantwortung

Project
Active

To finance an infrastructure program to expand and strengthen the electricity distribution system in Sulawesi and Nusa Tenggara, the state-owned energy supplier and project sponsor PT.PLN is to be provided with an FC development loan of up to USD 310 million or the equivalent in euros. The total volume of the program is USD 2.2 billion and is being co-financed with the Asian Development Bank (ADB)

Project Information FAQ

Project Information

5 Q
The project “Sustainable energy access in Eastern Indonesia - Sulawesi and Nusa Tenggara Power Grid Development Program (RBL)” is an infrastructure initiative in the Cement sector, located in Indonesia. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

To finance an infrastructure program to expand and strengthen the electricity distribution system in Sulawesi and Nusa Tenggara, the state-owned energy supplier and project sponsor PT.PLN is to be provided with an FC development loan of up to USD 310 million or the equivalent in euros. The total volume of the program is USD 2.2 billion and is being co-financed with the Asian Development Bank (ADB). In addition to the KfW financing contribution, the ADB has provided a loan of USD 600 million. PLN's own contribution is around USD 1.3 billion. The project is structured as a results-based loan and was prepared in terms of content by the ADB with the involvement of the KfW. The implementation structure of the program is geared towards achieving concrete results, which are the basis for the disbursement of funds. The following information will be used as the main indicators for the implementation of the project: - Annual increase in newly connected electricity customers (households and production, commercial and service companies) - Annual increase in the amount of energy made available to households, businesses and companies - Annual reduction in longer interruptions in the electrical supply network At the line level, this will involve, among other things, extensive expansion of additional low and medium voltage lines and extensive installation of additional distribution transformers. For each year of implementation of the project, target values will be set which PT.PLN must achieve by using its own systems. The achievement of the targets will be checked by a specialised consulting company (so-called Independent Verification Agent). Based on the achievement of the indicators, linked payments will be released (so-called disbursement-linked indicators). The implementation period, within which specific target values must be achieved for each year, is planned for the KfW contribution to the program until 2022.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data