Sustainable Financing for Rogun Hydropower Project
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The objective of the Sustainable Financing for Rogun Hydropower Project for Tajikistan is to increase the supply of clean, affordable, and climate-resilient hydroelectricity for consumers in Tajikistan and the Central Asia region. There are four components to the project, the first component being construction activities. Activities include: (i) design and supply of replacement runners for generat
- Status
- Prospective
- Sector
- Water Supply and Storage, Power Generation (CCGT), Biomass, Wind, Waste Processing and Treatment, Hydro, Government
- Location
- Tajikistan
- Updated
- 19 Nov 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Sustainable Financing for Rogun Hydropower Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The objective of the Sustainable Financing for Rogun Hydropower Project for Tajikistan is to increase the supply of clean, affordable, and climate-resilient hydroelectricity for consumers in Tajikistan and the Central Asia region. There are four components to the project, the first component being construction activities. Activities include: (i) design and supply of replacement runners for generating units 5 and 6 and design, supply, and installation of electro-mechanical equipment for generating units 3 and 4 with a combined installed capacity of approximately 1,260 MW, including turbines, generators, frequency governor, excitation system, electrical systems, unit-related monitoring system, cooling water system, compressed air system for the governor, fire detection and suppression systems (lot 1); and (ii) installation of replacement runners for generating units 5 and 6 and other turbine rehabilitation works and control system integration (lot 1A). The design of electromechanical equipment includes design specifications that account for projected increases in precipitation due to climate change, thereby minimizing the risk of damage or dam failure. The second component is the project implementation support. This component includes project management consultants, employer costs, and implementation support. The third component is implementing a resettlement action plan (rap) and livelihood restoration plan. Finally, the fourth component is the hydro-meteorological activities. This component includes hydromet investments, TA for improved water use, and monitoring water use. |
Original sector | Energy and Mineral Resources,Water, Sanitation and Waste Management |
Budget |
Location
Country | Tajikistan |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Biomass, Wind, Waste Processing and Treatment, Hydro, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Tajikistan
- Sangtuda 2 Hydropower Plant
- PamirEnergy
- Tajikistan: Obigarm-Nurobod Road Project - Long Bridge and Approaches
- Enhancing Sustainability: Financing for the Rogun Hydropower Project
- Yavan Water
- Tajikistan: Nurek Hydropower Rehabilitation, Phase I
- Water Resources Management in Pyanj River Basin Project
- Central Asia Regional Economic Cooperation Corridors 2, 5, and 6 (Dushanbe–Kurgonteppa) Road Project
