Sustainable Least-Cost Electrification-2 (ISLE-2) Project
Sector: Power Generation (CCGT) • Location: Indonesia
Source: Tempo.co English
A blended finance program to expand energy access for 3.5 million people and build 540 MW capacity of solar and wind power plants in Kalimantan and Sumatra. The project aims to reduce power generation costs by at least 8% and cut greenhouse gas emissions by 10%. It utilizes the World Bank's step-up loan product scheme to provide low interest rates and attract private investment.
- Status
- Closed
- Sector
- Power Generation (CCGT), Solar, Wind, Government
- Location
- Indonesia
- Updated
- 22 Jul 2026
- Source
- Tempo.co English
ConstructChat
Ask ConstructChat about Sustainable Least-Cost Electrification-2 (ISLE-2) Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A blended finance program to expand energy access for 3.5 million people and build 540 MW capacity of solar and wind power plants in Kalimantan and Sumatra. The project aims to reduce power generation costs by at least 8% and cut greenhouse gas emissions by 10%. It utilizes the World Bank's step-up loan product scheme to provide low interest rates and attract private investment. |
Original sector | Energy |
Budget |
Location
Country | Indonesia |
Source
Source | Tempo.co English |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Solar, Wind, Government |
Article published date | 2025-06-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
