Sutton Bridge Solar Farm
Sector: Bridge • Location: United Kingdom
Source: GreentechLead
EDF Renewables has started operations at its first solar farm in the UK, the 49.9 MW Sutton Bridge site in Lincolnshire, which began generating clean electricity in 2023 and provides enough power for over 9,000 homes annually.
- Status
- Closed
- Sector
- Bridge, Solar, Raw Materials, Power Generation (CCGT)
- Location
- United Kingdom
- Updated
- 22 Jul 2026
- Source
- GreentechLead
ConstructChat
Ask ConstructChat about Sutton Bridge Solar Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | EDF Renewables has started operations at its first solar farm in the UK, the 49.9 MW Sutton Bridge site in Lincolnshire, which began generating clean electricity in 2023 and provides enough power for over 9,000 homes annually. |
Original sector | Energy |
Location
Country | United Kingdom (UK) |
Source
Source | GreentechLead |
URL |
More Details
Record type | Project |
Sector | Bridge, Solar, Raw Materials, Power Generation (CCGT) |
Article published date | 2025-04-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
