Suvorovo Wind Farm was a 60 MW situated around 25 km inland from the Black Sea in the land of Suvorovo Municipality, Varna District. The power plant comprised 30 Gamesa G90 wind turbines with a capacity of 2 MW each. The power grid connection would be established through 110/20 kV substation and 110 kV overhead power line. The overhead high voltage electric line connecting Suvorovo Wind Farm conne

Status
Prospective
Sector
Commercial, Wind, Car parking, Power Generation (CCGT), Raw Materials, Water Supply and Storage, Government, Power Transmission, Automotive
Location
Bulgaria
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Suvorovo Wind Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Suvorovo Wind Farm” is an infrastructure initiative in the Commercial sector, located in Bulgaria. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Suvorovo Wind Farm was a 60 MW situated around 25 km inland from the Black Sea in the land of Suvorovo Municipality, Varna District. The power plant comprised 30 Gamesa G90 wind turbines with a capacity of 2 MW each. The power grid connection would be established through 110/20 kV substation and 110 kV overhead power line. The overhead high voltage electric line connecting Suvorovo Wind Farm connection point would be provided by NEK in Valchi Dol substation. The project was expected to contribute to the expansion of renewable energy markets in Bulgaria supporting the country in achieving its target of sourcing 16% of its electricity consumed from renewable sources by 2020. The power plant was expected to produce enough power to supply 7,000 households. Vetroenergien Park Suvorovo was the project company created to build and operate Suvorovo Wind Farm. The company was owned Eolica Bulgaria AD, which was owned by Spain's Grupo Empresarial Enhol (65%) and Bulgaria's Balkars Consortium (35%). In December 2007, the project was granted a 25-year generation license by the State Commission for Energy and Water Regulation. The final building permit was approved on June 26, 2009. In August 2009, the project company reported that it had received all statutory approvals needed to proceed with the project. The total project cost was US$143.64 million. The project reached financial closure in Febraury 2010. Of project cost, EBRD put forward $79.8m, of which $23.3m was sold down at syndication, which the Black Sea Trade and Development Bank (BSTDB) supplied the remaining $14.6m. UniCredit Bulbank provided a VAT facility for the project. Tenor on the debt stands at 16 years for the original lenders and 13.5 years for the participant. Construction work started in 2009, but was halted until June 30, 2010, during the bird rearing season. The project became operational December 2010.

Original sector

Energy

Budget

Location

Country

Bulgaria

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Wind, Car parking, Power Generation (CCGT), Raw Materials, Water Supply and Storage, Government, Power Transmission, Automotive

Article published date

2024-06-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project