logo

SV 23-11 - FY 2023-24 Annual Major Streets Rehabilitation Program: Madera Road

Sector: Cement • Location: California, United States of America (USA)

Source: City of Simi Valley

Project
Under Construction

The project includes concrete repair, full-width grinding, new asphalt pavement, and new traffic striping on Madera Road between Royal Avenue and City Limit. North Bound - The project includes concrete repair, Micro-surfacing, and new traffic striping on Madera Road between City Limit and Royal Avenue. Micro-surfacing - A thin maintenance treatment applied on the existing road surface. The treatme

Project Information FAQ

Project Information

4 Q
The project “SV 23-11 - FY 2023-24 Annual Major Streets Rehabilitation Program: Madera Road” is an infrastructure initiative in the Cement sector, located in California, United States of America (USA). Taiyo aggregates data on it from City of Simi Valley.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project includes concrete repair, full-width grinding, new asphalt pavement, and new traffic striping on Madera Road between Royal Avenue and City Limit. North Bound - The project includes concrete repair, Micro-surfacing, and new traffic striping on Madera Road between City Limit and Royal Avenue. Micro-surfacing - A thin maintenance treatment applied on the existing road surface. The treatment consists of a mixture of polymer modified emulsion, graded aggregates (Type III used), mineral fillers, water, and other additives. Micro-surfacing uses a chemical reaction to cure which makes it very suitable for night work. Benefits: Cost effective; Minimizes oxidation/aging, reduces water infiltration, corrects raveling, weathering, provides skid resistance, improves aesthetics, corrects rutting and minor surface profile irregularities; Average performance life: 5 to 7 years.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data