logo
ProjectComplete

Sveti Stefan Hotel Complex PPP

Sector: Solar • Location: Montenegro

Source: European Bank for Reconstruction and Development (EBRD)

Translated version of this PSD: Montenegrin The EBRD is considering providing a €37 million long term debt facility to Adriatic Properties D.O.O (the “Company”), to finance the re-development of a landmark tourist site on the Montenegro’s coast into a prime resort which will set a benchmark for low-density, sustainable tourism. The project is located on a land plot of 68,000 m2 which includes the

Status
Closed
Sector
Solar, Water Supply and Storage, Hotel, Geothermal, Biomass, Residential, Waste Processing and Treatment, Commercial, Government
Location
Montenegro
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Sveti Stefan Hotel Complex PPP

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Sveti Stefan Hotel Complex PPP” is an infrastructure initiative in the Solar sector, located in Montenegro. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Sponsoring Agency

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Translated version of this PSD: Montenegrin The EBRD is considering providing a €37 million long term debt facility to Adriatic Properties D.O.O (the “Company”), to finance the re-development of a landmark tourist site on the Montenegro’s coast into a prime resort which will set a benchmark for low-density, sustainable tourism. The project is located on a land plot of 68,000 m2 which includes the Sveti Stefan peninsular village and some additional area along the Montenegrin Adriatic sea coast. The Project will be built in 2 phases. The project is expected to generate strong transition impact due to the following: Skills transfer deriving from the hotel operator (Aman Resorts)’s undertaking to retain part of the Company’s existing staff and development of a specific training programmes for them, as well as for new employees (mainly hospitality-related and managerial specialisations). Adriatic Properties D.O.O., a special purpose vehicle, organised and existing under the laws of Montenegro and ultimately owned by the Restis group of companies. The Restis group of companies is one of the largest shipping groups in Greece. It is owned by the Restis family, which is headed by Mr Victor Restis. Adriatic Properties D.O.O. holds the development, operating and leasehold rights for the Project. €37 million long term debt facility under A/B structure, with two separate tranches (one tranche per phase). €92.6 million. Screening categories and rationale for classification Screened B (2008). The refurbishment/construction and operation of a hotel complex may be associated with some environmental and health issues, which are site specific and can be readily identified, assessed and mitigated. Environmental and Social Due Diligence Due Diligence including reviews of the technical report, completed Environmental and Social Questionnaire and the Bank’s environmental specialist’s visit covered the whole area of the client's land plot. The environmental and social due diligence to date did not identify any significant environmental or social issues. The key findings to date include the following: (i) the project is consistent with the city's master plan and the country's low density tourism development strategy rather than mass tourism, and is complementary to the World Bank's on-going Sustainable Tourism Project; (ii) Sveti Stefan Island is a protected monument of culture of II category in the country, and the refurbishment work fully complies with the relevant regulatory requirements and has been conducted under the supervision of the Institute for Cultural Monuments Protection ; (iii) the project will benefit from the EBRD/World Bank supported Montenegro Regional Water Supply Project; (iv) solid waste from the project will be sent to the Podgorica's sanitary landfill which is the only operating sanitary landfill in the country; (v) waste water from the project will be addressed by the municipality of Budva concession project to construct a sewage network, a pumping station and new waste water treatment plants. Environmental and Social Action Plan (ESAP) is currently being developed to ensure adequate mitigation measures are in place to comply with the requirements under the Bank’s Performance Requirements . Implementation Requirements The client is required to ensure that the project will comply with EBRD Performance Requirements and agree and implement an Environmental and Social Action Plan (ESAP) as well as submit annual report to the Bank on environmental and social matters. The Bank will monitor the project’s environmental and social performance by reviewing the annual environmental and social report and site visits where necessary and appropriate. Energy Efficiency The Client has worked with the Bank on identifying and exploiting sustainable energy opportunities in the Project. The energy performance assessment confirmed that the Project features some best available techniques such as energy saving lighting, integrated building management system for the Queen's Beach hotel and energy management system for the Sveti Stefan island facilities. Solar thermal installations are under consideration and under investigation for compliance with national architectural protection regulations. Through these sustainable energy investments, the Project is better by 15.4% from the energy baseline, defined by requirements of national regulations. None. Milena Vukovic Adriatic Properties d.o.o Hotel Kraljičina plaža Miločer, Sveti Stefan, Budva, Montenegro vukovicmilena@adriaticproperties.me phone: +382 33 468 825 fax : + 382 33 468 577

Original sector

Real Estate

Procurement method

Location

Country

Montenegro

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Solar, Water Supply and Storage, Hotel, Geothermal, Biomass, Residential, Waste Processing and Treatment, Commercial, Government

Article published date

2025-07-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project