SVP (Shared Vision Program) Facilitation
Sector: Water Supply and Storage • Location: Africa
Source: World Bank Group
The Master Project Appraisal Document for the Nile Basin Initiative long-term goal of the Shared Vision Program (SVP) is to create the enabling environment for the Nile riparians to realize their vision to "achieve sustainable socioeconomic development through the equitable utilization of, and benefit from, the common Nile Basin water resources." The specific development objective of the Shared Vi
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Raw Materials, Government
- Location
- Unknown (Sub-Saharan Africa)
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about SVP (Shared Vision Program) Facilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Master Project Appraisal Document for the Nile Basin Initiative long-term goal of the Shared Vision Program (SVP) is to create the enabling environment for the Nile riparians to realize their vision to "achieve sustainable socioeconomic development through the equitable utilization of, and benefit from, the common Nile Basin water resources." The specific development objective of the Shared Vision Program is to build trust, capacity, and an enabling environment for investment in Nile Basin countries. This objective will be achieved through the implementation of the projects in the SVP portfolio and the successful coordination and management of the program throughout the basin. The projects in the SVP portfolio and their primary objectives are as follows: Provide a strategic framework for environmentally sustainable development of the Nile River Basin and support basinwide environmental action linked to transboundary issues in the context of the NBI Strategic Action Program. Establish the institutional means to coordinate the development of regional power markets among the Nile Basin countries. Provide a sound conceptual and practical basis to increase the availability and efficient use of water for agricultural production. Enhance analytical capacity for a basinwide perspective to support the development, management, and protection of Nile Basin water resources in an equitable, optimal, integrated and sustainable manner. Develop confidence in regional cooperation under the Nile Basin Initiative (NBI), both at the basin and local levels, and ensure full stakeholder involvement in the NBI and its projects. Strengthen the capacity in selected subject areas of water resources planning and management in the public and private sectors and community groups; strengthen centers with the capacity to develop and deliver programs on a continuing basis; and expand the frequency and scope of basin interchange among water professionals. Strengthen Nile River basinwide socioeconomic cooperation and integration. Strengthen the capacity of NBI institutions to execute basinwide programs and ensure effective oversight and coordination of the NBl's Shared Vision Program. |
Original sector | FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Unknown (Sub-Saharan Africa) |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
