SW High Meadow Ave & Sunset Trail Intersection Improvement
One of 10,000+ projects Taiyo tracks in Florida.
Source: Dodge USA
The SW High Meadow Avenue (CR-713) & SW Sunset Trail Intersection Improvements project will include roadway construction of a single lane roundabout, minor widening on SW Sunset Trail, various drainage, and sidewalk improvements. The complete project scope includes excavation, embankment, milling of existing asphalt, base, stabilization, asphalt paving, concrete sidewalk and curb, performance turf
- Status
- Closed
- Sector
- Car parking, Road, Water Supply and Storage, Commercial, Cement, Power Transmission, Waste Processing and Treatment, Mass Transit, Automotive, Rail, Government, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Palm City, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about SW High Meadow Ave & Sunset Trail Intersection Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The SW High Meadow Avenue (CR-713) & SW Sunset Trail Intersection Improvements project will include roadway construction of a single lane roundabout, minor widening on SW Sunset Trail, various drainage, and sidewalk improvements. The complete project scope includes excavation, embankment, milling of existing asphalt, base, stabilization, asphalt paving, concrete sidewalk and curb, performance turf, stormwater structure placement, pavement marking and signage, and utility adjustments. The scop... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Palm City |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Water Supply and Storage, Commercial, Cement, Power Transmission, Waste Processing and Treatment, Mass Transit, Automotive, Rail, Government, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-08-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
