SW High Meadow Ave & Sunset Trail Intersection Improvement
Sector: Power Transmission • Location: Palm City, Florida, United States of America
Source: Dodge USA
The SW High Meadow Avenue (CR-713) & SW Sunset Trail Intersection Improvements project will include roadway construction of a single lane roundabout, minor widening on SW Sunset Trail, various drainage, and sidewalk improvements. The complete project scope includes excavation, embankment, milling of existing asphalt, base, stabilization, asphalt paving, concrete sidewalk and curb, performance turf
- Status
- Prospective
- Sector
- Power Transmission, Cement, Car parking, Road, Waste Processing and Treatment, Water Supply and Storage, Commercial, Mass Transit, Automotive, Rail, Government, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Palm City, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about SW High Meadow Ave & Sunset Trail Intersection Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The SW High Meadow Avenue (CR-713) & SW Sunset Trail Intersection Improvements project will include roadway construction of a single lane roundabout, minor widening on SW Sunset Trail, various drainage, and sidewalk improvements. The complete project scope includes excavation, embankment, milling of existing asphalt, base, stabilization, asphalt paving, concrete sidewalk and curb, performance turf, stormwater structure placement, pavement marking and signage, and utility adjustments. The scop... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Palm City |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Cement, Car parking, Road, Waste Processing and Treatment, Water Supply and Storage, Commercial, Mass Transit, Automotive, Rail, Government, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
