Sw Kestor Drive Sidewalk Construction
Sector: Water Supply and Storage • Location: Port Saint Lucie, Florida, United States of America
Source: Dodge
he project is to construct approximately 1.38 miles of 6-foot-wide concrete sidewalk on the north and east side of SW Kestor Drive from SW Darwin Boulevard to SW Becker Road. The project includes, but not limited to, concrete sidewalk, earthwork, clearing and grubbing, drainage modifications, swale relocation, utility relocations, record drawings, and all work and materials to provide a complete p
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Government, Power Transmission, Car parking, Commercial, Power Generation (CCGT), Seaport, Waste Processing and Treatment, Road, Automotive
- Location
- Port Saint Lucie, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Sw Kestor Drive Sidewalk Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | he project is to construct approximately 1.38 miles of 6-foot-wide concrete sidewalk on the north and east side of SW Kestor Drive from SW Darwin Boulevard to SW Becker Road. The project includes, but not limited to, concrete sidewalk, earthwork, clearing and grubbing, drainage modifications, swale relocation, utility relocations, record drawings, and all work and materials to provide a complete project as shown and described in the contract documents, bid specifications and project plan sets... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Port Saint Lucie |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Power Transmission, Car parking, Commercial, Power Generation (CCGT), Seaport, Waste Processing and Treatment, Road, Automotive |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
