Sw S 38th & Tyler Pervious Concrete Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
This Contract shall generally consist of removing and replacing existing pavement, storm sewer pipe and installing a stormwater treatment structure. Landscape restoration is also included, all in accordance with the Contract Plans, these Contract Provisions, and the Standard Specifications.
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Cement, Government, Road, Commercial
- Location
- Tacoma, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sw S 38th & Tyler Pervious Concrete Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This Contract shall generally consist of removing and replacing existing pavement, storm sewer pipe and installing a stormwater treatment structure. Landscape restoration is also included, all in accordance with the Contract Plans, these Contract Provisions, and the Standard Specifications. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Tacoma |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Cement, Government, Road, Commercial |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
