logo

SW Topeka Boulevard Improvements - 38th St to 49th St

Sector: Government • Location: Topeka, Kansas, United States of America

Source: Dodge

Project
Planning Schematics

The scope of this project encompasses a mill and overlay, along with localized base patching, on South Topeka Blvd between 38th and 49th streets. Design activities are scheduled for 2026, with utility relocation and minor right-of-way acquisition anticipated in 2027. The construction phase is planned for 2028. There will be replacement of the traffic signal at 38th and Topeka Blvd.

Status
Prospective
Sector
Government, Road, Commercial, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT)
Location
Topeka, Kansas, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about SW Topeka Boulevard Improvements - 38th St to 49th St

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SW Topeka Boulevard Improvements - 38th St to 49th St” is an infrastructure initiative in the Government sector, located in Topeka, Kansas, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The scope of this project encompasses a mill and overlay, along with localized base patching, on South Topeka Blvd between 38th and 49th streets. Design activities are scheduled for 2026, with utility relocation and minor right-of-way acquisition anticipated in 2027. The construction phase is planned for 2028. There will be replacement of the traffic signal at 38th and Topeka Blvd.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Kansas

City

Topeka

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Government, Road, Commercial, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT)

Article published date

2025-03-31

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project