Swallow Tail BESS
Sector: Energy Storage • Location: Bannaby, New South Wales, Australia
Source: ESS News
A 375MW/1.5GWh grid-forming battery energy storage system proposed by AMPYR Australia near Bannaby, New South Wales. The project aims to contribute to voltage and reactive power management and will connect to the Transgrid Bannaby Substation via new 330kV lines. An Environmental Impact Statement is in preparation.
- Status
- Prospective
- Sector
- Energy Storage, Power Generation (CCGT)
- Location
- Bannaby, New South Wales, Australia
- Updated
- 22 Jul 2026
- Source
- ESS News
ConstructChat
Ask ConstructChat about Swallow Tail BESS
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 375MW/1.5GWh grid-forming battery energy storage system proposed by AMPYR Australia near Bannaby, New South Wales. The project aims to contribute to voltage and reactive power management and will connect to the Transgrid Bannaby Substation via new 330kV lines. An Environmental Impact Statement is in preparation. |
Original sector | Energy Storage |
Location
Country | Australia |
State | New South Wales |
City | Bannaby |
Source
Source | ESS News |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Power Generation (CCGT) |
Article published date | 2026-03-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
