Swamp Rabbit Gravity Upgrade
One of 10,000+ projects Taiyo tracks in South Carolina.
Source: Dodge USA
Installation of a new gravity sewer system including approximately 15,000 linear feet of ductile iron piping ranging from 8 to 48 inches in diameter, approximately 60 manhole structures ranging from 4 to 8 feet in diameter.
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Metal, Government, Steel
- Location
- Greenville, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Swamp Rabbit Gravity Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Installation of a new gravity sewer system including approximately 15,000 linear feet of ductile iron piping ranging from 8 to 48 inches in diameter, approximately 60 manhole structures ranging from 4 to 8 feet in diameter. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Greenville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Metal, Government, Steel |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
