Swastika Sewer System Upgrade / Swastika Water Pollution Control Plant Decommissioning
Sector: Waste Processing and Treatment • Location: Ontario, Canada
Source: Infrastructure Canada
The main scope of the project is to: 1) Decommission the Swastika Water Pollution Control Plant (WPCP) - treatment processes in the WPCP would no longer to used. A decommissioning plan needs to be implemented for all equipment. 2) Add lift station in the Swastika WPCP - a portion of the existing Swastika WPCP would be turned into a lift station to pump sewage to the existing Swastika Lift Station
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The main scope of the project is to: 1) Decommission the Swastika Water Pollution Control Plant (WPCP) - treatment processes in the WPCP would no longer to used. A decommissioning plan needs to be implemented for all equipment. 2) Add lift station in the Swastika WPCP - a portion of the existing Swastika WPCP would be turned into a lift station to pump sewage to the existing Swastika Lift Station located approximately 800 meters north of the WPCP, utilizing the existing underground forcemain. 3) Install approximately 5 kilometers of new underground forcemain connecting from the Swastika Lift Station to the existing Chaput Lift Station in the Town of Kirkland Lake - the Chaput Lift Station currently pumps sewage to the Kirkland Lake Wastewater Treatment Plant; hence, minimal work is required to be completed at the Chaput Lift Station. Two or three booster stations are likely required along the 5 kilometers of forcemain to maintain pressure along the forcemain. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
