Swastika Sewer System Upgrade / Swastika Water Pollution Control Plant Decommissioning
One of 10,000+ projects Taiyo tracks in Ontario.
Source: Infrastructure Canada
The main scope of the project is to: 1) Decommission the Swastika Water Pollution Control Plant (WPCP) - treatment processes in the WPCP would no longer to used. A decommissioning plan needs to be implemented for all equipment. 2) Add lift station in the Swastika WPCP - a portion of the existing Swastika WPCP would be turned into a lift station to pump sewage to the existing Swastika Lift Station
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Commercial
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Swastika Sewer System Upgrade / Swastika Water Pollution Control Plant Decommissioning
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The main scope of the project is to: 1) Decommission the Swastika Water Pollution Control Plant (WPCP) - treatment processes in the WPCP would no longer to used. A decommissioning plan needs to be implemented for all equipment. 2) Add lift station in the Swastika WPCP - a portion of the existing Swastika WPCP would be turned into a lift station to pump sewage to the existing Swastika Lift Station located approximately 800 meters north of the WPCP, utilizing the existing underground forcemain. 3) Install approximately 5 kilometers of new underground forcemain connecting from the Swastika Lift Station to the existing Chaput Lift Station in the Town of Kirkland Lake - the Chaput Lift Station currently pumps sewage to the Kirkland Lake Wastewater Treatment Plant; hence, minimal work is required to be completed at the Chaput Lift Station. Two or three booster stations are likely required along the 5 kilometers of forcemain to maintain pressure along the forcemain. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Commercial |
Article published date | 2026-05-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
